Cornerstone School Renovation

[tags_no_comma_shortcode]

Location

Value

Owner

Contract

Architect

Quick Summary

Project Details

Renovation to the main reception area, administration offices and meeting rooms, as well as the expansion of the second floor and the addition of a new hydraulic elevator were the main features of this project. The original building is a pile-supported structure requiring us to install a few new piles inside the existing building.  The original structural design called for traditional steel piles, but a pile-driving machine couldn’t fit inside the building.  We proposed a redesign using a larger quantity of smaller helical piles which were driven with a much smaller machine that just neatly fit through the front double doors.

Related Projects

FDK Modular Classrooms

This project was dominated by logistics – 10 new free-standing pre-manufactured classrooms on 7 different sites – ALL COMPLETED IN UNDER 6 MONTHS !  In

Read More »

Centennial Pool

This was a unique project and delivery method where we were responsible for assembling a team to design a new gender-neutral accessible change room for

Read More »